Cmm in practice : processes for executing software projects at Infosys (Record no. 101583)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 02985nam a2200181Ia 4500 |
020 ## - INTERNATIONAL STANDARD BOOK NUMBER | |
International Standard Book Number | 978-0201616262 |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | 005.10685 JAL |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Jalote, Pankaj |
245 ## - TITLE STATEMENT | |
Title | Cmm in practice : processes for executing software projects at Infosys |
250 ## - EDITION STATEMENT | |
Edition statement | - |
260 ## - PUBLICATION, DISTRIBUTION, ETC. | |
Name of publisher, distributor, etc. | Addison Wesley |
Place of publication, distribution, etc. | New York |
Date of publication, distribution, etc. | 2000 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | xv, 372 p. |
Other physical details | 24 cm ; Hard Bound |
490 ## - SERIES STATEMENT | |
Series statement | SEI series in Software Engineering |
500 ## - GENERAL NOTE | |
General note | $54.95 |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | 1.1 Process-Based Approach for Project Execution 2 --<br/>1.2 Capability Maturity Model for Software 5 --<br/>1.3 Processes at Infosys 15 --<br/>Part I Project Initiation --<br/>2 Proposals and Contracts 37 --<br/>2.1 Customer and Vendor Interaction 38 --<br/>2.2 The Proposal 40 --<br/>2.3 The Contract 42 --<br/>3 Requirements Specification and Management 45 --<br/>3.1 Requirements Analysis and Specification 46 --<br/>3.2 Requirements Change Management 53 --<br/>3.3 Traceability Management 58 --<br/>3.4 Example: The WAR System 62 --<br/>Part II Project Planning --<br/>4 Process Definition and Tailoring 73 --<br/>4.1 Development Process 74 --<br/>4.2 Process Tailoring 85 --<br/>5 Process Database and Process Capability Baseline 97 --<br/>5.1 Software Metrics and Process Management 98 --<br/>5.2 Process Database 103 --<br/>5.3 Process Capability Baseline 110 --<br/>6 Effort Estimation and Scheduling 119 --<br/>6.1 Background 120 --<br/>6.2 Bottom-Up Estimation 124 --<br/>6.3 Top-Down Estimation 134 --<br/>6.4 Scheduling 136 --<br/>7 Quality Planning and Defect Estimation 145 --<br/>7.1 Quality Management 146 --<br/>7.2 Quantitative Quality Management Planning 151 --<br/>8 Risk Management 159 --<br/>8.1 Background 160 --<br/>8.2 Risk Assessment 163 --<br/>8.3 Risk Control 166 --<br/>8.4 Examples 170 --<br/>9 Project Management Plan 175 --<br/>9.1 Project Management Plan 176 --<br/>9.2 Example: Project Plan of WAR 2.0 178 --<br/>10 Configuration Management 195 --<br/>10.1 Configuration Management Concepts 196 --<br/>10.2 Configuration Management Process 200 --<br/>10.3 Document Control 207 --<br/>10.4 Example: Configuration Management Plan of the WAR Project 209 --<br/>Part III Project Execution and Termination --<br/>11 Life Cycle Execution 219 --<br/>11.1 High-Level Design 220 --<br/>11.2 Detailed Design 223 --<br/>11.3 Build 224 --<br/>11.4 System Testing 226 --<br/>11.5 Acceptance and Installation 231 --<br/>12 Peer Review 233 --<br/>12.1 Review Process 235 --<br/>12.2 Data Collection 243 --<br/>12.3 Monitoring and Control 245 --<br/>12.4 Introduction of Reviews and the NAH Syndrome 252 --<br/>13 Project Monitoring and Control 259 --<br/>13.1 Data Collection 260 --<br/>13.2 Project Tracking 271 --<br/>13.3 Quantitative Monitoring and Control 275 --<br/>13.4 Defect Analysis and Prevention 283 --<br/>14 Project Audits 291 --<br/>14.1 Audit Process 294 --<br/>14.2 Audit Analysis 302 --<br/>15 Project Closure 307 --<br/>15.1 Project Closure Analysis 308 --<br/>15.2 Archiving 313 --<br/>15.3 Closure Analysis Report for WAR 2.0 314 --<br/>Appendix A From ISO 9000 to CMM 325 --<br/>Appendix B Managing the Software Process Improvement Project 343. |
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical term or geographic name entry element | Information technology |
-- | Software engineering |
-- | Capability maturity model (Computer software) |
942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
Koha item type | Books |
Withdrawn status | Lost status | Damaged status | Not for loan | Collection code | Home library | Current library | Date acquired | Cost, normal purchase price | Total Checkouts | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
GSB Collection | 04/04/2014 | 3.00 | 005.10685 JAL | B1125 | 04/04/2014 | 04/04/2014 | Books |