Amazon cover image
Image from Amazon.com

Cmm in practice : processes for executing software projects at Infosys

By: Material type: TextTextSeries: SEI series in Software EngineeringPublication details: Addison Wesley New York 2000Edition: -Description: xv, 372 p. 24 cm ; Hard BoundISBN:
  • 978-0201616262
Subject(s): DDC classification:
  • 005.10685 JAL
Contents:
1.1 Process-Based Approach for Project Execution 2 -- 1.2 Capability Maturity Model for Software 5 -- 1.3 Processes at Infosys 15 -- Part I Project Initiation -- 2 Proposals and Contracts 37 -- 2.1 Customer and Vendor Interaction 38 -- 2.2 The Proposal 40 -- 2.3 The Contract 42 -- 3 Requirements Specification and Management 45 -- 3.1 Requirements Analysis and Specification 46 -- 3.2 Requirements Change Management 53 -- 3.3 Traceability Management 58 -- 3.4 Example: The WAR System 62 -- Part II Project Planning -- 4 Process Definition and Tailoring 73 -- 4.1 Development Process 74 -- 4.2 Process Tailoring 85 -- 5 Process Database and Process Capability Baseline 97 -- 5.1 Software Metrics and Process Management 98 -- 5.2 Process Database 103 -- 5.3 Process Capability Baseline 110 -- 6 Effort Estimation and Scheduling 119 -- 6.1 Background 120 -- 6.2 Bottom-Up Estimation 124 -- 6.3 Top-Down Estimation 134 -- 6.4 Scheduling 136 -- 7 Quality Planning and Defect Estimation 145 -- 7.1 Quality Management 146 -- 7.2 Quantitative Quality Management Planning 151 -- 8 Risk Management 159 -- 8.1 Background 160 -- 8.2 Risk Assessment 163 -- 8.3 Risk Control 166 -- 8.4 Examples 170 -- 9 Project Management Plan 175 -- 9.1 Project Management Plan 176 -- 9.2 Example: Project Plan of WAR 2.0 178 -- 10 Configuration Management 195 -- 10.1 Configuration Management Concepts 196 -- 10.2 Configuration Management Process 200 -- 10.3 Document Control 207 -- 10.4 Example: Configuration Management Plan of the WAR Project 209 -- Part III Project Execution and Termination -- 11 Life Cycle Execution 219 -- 11.1 High-Level Design 220 -- 11.2 Detailed Design 223 -- 11.3 Build 224 -- 11.4 System Testing 226 -- 11.5 Acceptance and Installation 231 -- 12 Peer Review 233 -- 12.1 Review Process 235 -- 12.2 Data Collection 243 -- 12.3 Monitoring and Control 245 -- 12.4 Introduction of Reviews and the NAH Syndrome 252 -- 13 Project Monitoring and Control 259 -- 13.1 Data Collection 260 -- 13.2 Project Tracking 271 -- 13.3 Quantitative Monitoring and Control 275 -- 13.4 Defect Analysis and Prevention 283 -- 14 Project Audits 291 -- 14.1 Audit Process 294 -- 14.2 Audit Analysis 302 -- 15 Project Closure 307 -- 15.1 Project Closure Analysis 308 -- 15.2 Archiving 313 -- 15.3 Closure Analysis Report for WAR 2.0 314 -- Appendix A From ISO 9000 to CMM 325 -- Appendix B Managing the Software Process Improvement Project 343.
Tags from this library: No tags from this library for this title. Log in to add tags.
Holdings
Item type Current library Collection Call number Status Date due Barcode
Books Books H.T. Parekh Library GSB Collection 005.10685 JAL (Browse shelf(Opens below)) Available B1125

$54.95

1.1 Process-Based Approach for Project Execution 2 --
1.2 Capability Maturity Model for Software 5 --
1.3 Processes at Infosys 15 --
Part I Project Initiation --
2 Proposals and Contracts 37 --
2.1 Customer and Vendor Interaction 38 --
2.2 The Proposal 40 --
2.3 The Contract 42 --
3 Requirements Specification and Management 45 --
3.1 Requirements Analysis and Specification 46 --
3.2 Requirements Change Management 53 --
3.3 Traceability Management 58 --
3.4 Example: The WAR System 62 --
Part II Project Planning --
4 Process Definition and Tailoring 73 --
4.1 Development Process 74 --
4.2 Process Tailoring 85 --
5 Process Database and Process Capability Baseline 97 --
5.1 Software Metrics and Process Management 98 --
5.2 Process Database 103 --
5.3 Process Capability Baseline 110 --
6 Effort Estimation and Scheduling 119 --
6.1 Background 120 --
6.2 Bottom-Up Estimation 124 --
6.3 Top-Down Estimation 134 --
6.4 Scheduling 136 --
7 Quality Planning and Defect Estimation 145 --
7.1 Quality Management 146 --
7.2 Quantitative Quality Management Planning 151 --
8 Risk Management 159 --
8.1 Background 160 --
8.2 Risk Assessment 163 --
8.3 Risk Control 166 --
8.4 Examples 170 --
9 Project Management Plan 175 --
9.1 Project Management Plan 176 --
9.2 Example: Project Plan of WAR 2.0 178 --
10 Configuration Management 195 --
10.1 Configuration Management Concepts 196 --
10.2 Configuration Management Process 200 --
10.3 Document Control 207 --
10.4 Example: Configuration Management Plan of the WAR Project 209 --
Part III Project Execution and Termination --
11 Life Cycle Execution 219 --
11.1 High-Level Design 220 --
11.2 Detailed Design 223 --
11.3 Build 224 --
11.4 System Testing 226 --
11.5 Acceptance and Installation 231 --
12 Peer Review 233 --
12.1 Review Process 235 --
12.2 Data Collection 243 --
12.3 Monitoring and Control 245 --
12.4 Introduction of Reviews and the NAH Syndrome 252 --
13 Project Monitoring and Control 259 --
13.1 Data Collection 260 --
13.2 Project Tracking 271 --
13.3 Quantitative Monitoring and Control 275 --
13.4 Defect Analysis and Prevention 283 --
14 Project Audits 291 --
14.1 Audit Process 294 --
14.2 Audit Analysis 302 --
15 Project Closure 307 --
15.1 Project Closure Analysis 308 --
15.2 Archiving 313 --
15.3 Closure Analysis Report for WAR 2.0 314 --
Appendix A From ISO 9000 to CMM 325 --
Appendix B Managing the Software Process Improvement Project 343.

There are no comments on this title.

to post a comment.

Copyright @ 2024  |  All rights reserved, H.T. Parekh Library, Krea University, Sri City